National Work Programme

This is the work programme that each European standardization organization and national standardization body has to make available under Chapter II Article 3 of Regulation (EU) No. 1025/2012 of the European Parliament and of the Council on European standardisation. This National Work Programme is updated on the first and fifteenth day of each month and contains:

  • current project proposals for the development or revision of national ÖNORMs (purely Austrian standards) and ONRs, and
  • current national ÖNORM and ONR projects, and
  • current drafts of national ÖNORMs and ONRs, and
  • current national ÖNORMs and ONRs published in the past 14 days.
  • current national ÖNORMs which are checked for relevance, necessity and suitability.
Document number Committee Startdate planned Draft
ÖNORM V 5750 Committee 163 2019-11-01 2021-06-01

Cargo securement - Methods

This Austrian Standard (ÖNORM) specifies methods for securing loads on transport vehicles in road, rail and ship traffic against the forces occurring during transport. It should provide those responsi...

ÖNORM D 2305 Committee 246 2019-11-01 2020-01-31

Decontamination of individuals after CBRN incidents - Requirements for on-scene emergency decontamination

This Austrian standard specifies a procedure for emergency decontamination of individuals affected by a CBRN incident. Definitions of required terms are provided. Guidelines for immediate response mea...

ÖNORM B 8115-3 Committee 208 2019-11-01 2020-12-01

Sound insulation and room acoustics in building construction - Part 3: Architectural acoustics

This Austrian Standard specifies requirements for room acoustics for (a) rooms in which a good audibility - especially speech intelligibility - should be ensured, eg. event spaces, classrooms; (b) p...

ÖNORM M 7323 Committee 007 2019-11-01 2020-10-01

Provisions for the installation of stationary pressure vessels for the storage of gases

This Austrian Standard shall be applied to the installation of stationary pressure vessels with a pressure-volume product over 3000 bar for the storage of gases or gas overlaid ingredients which are s...

ÖNORM B 3521 Committee 206 2019-10-01 2020-02-01

Design and construction of roofings and wall coverings of metal - Plumbers' work - Workmanlike

This standard specifies the Design and construction of roofings and wall coverings of metal for Plumbers' work....

ÖNORM B 5176-4 Committee 192 2019-10-01 2019-12-01

Internal plastics linings for concrete manhole bases - Part 4: Polyethylene (PE) linings - Requirements, tests, quality control

This document lays down terms, nominal diameters, dimensions, requirements, tests and the quality control for base liners of polypropylene serving for concrete manhole bases. This document is applicca...

ÖNORM B 5176-3 Committee 192 2019-10-01 2019-12-01

Internal plastics linings for concrete manhole bases - Part 3: Polyurethane (PU) linings - Requirements, tests, quality control

This document lays down terms, nominal diameters, dimensions, requirements, tests and the quality control for base liners of polypropylene serving for concrete manhole bases. This document is applicca...

ÖNORM B 5176-2 Committee 192 2019-10-01 2019-12-01

Internal plastics linings for concrete manhole bases - Part 2: Linings made of glass reinforced thermosetting plastics based on polyester resins (GRP) - Requirements, tests, quality control

This document lays down terms, nominal diameters, dimensions, requirements, tests and the quality control for base liners of polypropylene serving for concrete manhole bases. This document is applicca...

ÖNORM S 2207-2 Committee 199 2019-10-01 2020-10-01

Fermentation plants - Part 2: Technical requirements

The aim of ÖNORM S 2207 (all parts) is to define framework conditions for the planning, approval, construction and proper operation of biogas plants, taking into account the quality of gaseous, liquid...

ÖNORM S 2207-1 Committee 199 2019-10-01 2020-10-01

Fermentation plants - Part 1: Terms and definitions and basics

The aim of ÖNORM S 2207 (all parts) is to define framework conditions for the planning, approval, construction and proper operation of biogas plants, taking into account the quality of gaseous, liquid...